Wind Development Study (2022)
About this publication
This document provides an assessment of the extent and distribution of planning and environmental considerations that could affect the potential suitability of areas in South Tyneside for onshore wind energy development.
The analysis has then been used to understand whether it is appropriate to identify potentially suitable areas for wind turbine development in the Draft Local Plan 2021 to 2039.
Publishing information
From: Â鶹ÊÓƵ
Published: 2022
Local Plan reference: PRE2
Documents
PDF: Wind Development Study (2022) (PDF, 2 MB)
This file may not be suitable for users of assistive technology. If you need help to access this information within this file, please get in touch to request an accessible format.